| Rec-ID | Code | Recommendation |
|---|---|---|
| REC350-4698 | 38 - Agency/Department Reporting | The Committee recommends that the Multi-Hazard Advisory Council resume the Bushfire Council’s practice of providing annual reports to the Minister on bushfire preparedness ahead of every fire season. |
| REC350-4690 | 37 - Funding | The Committee recommends that PCS receive adequate funding for the 2023-24 EPSDD BOP to ensure all access maintenance activities listed as Priority 1, and that these activities are completed. |
| REC350-4707 | 38 - Agency/Department Reporting | The Committee recommends that the ACT Government conduct technology capability planning as part of the development of the Strategic Bushfire Management Plan version 5. |
| REC350-4706 | 38 - Agency/Department Reporting | The Committee recommends that the ACT Government develop a Natural Disaster Strategy that covers all aspects of health to ensure continuity of access to healthcare in the event of a natural disaster. |
| Rec-ID | Code | Recommendation |
|---|---|---|
| REC349-4674 | 39 - Disaster Risk Management | The Victorian Government to work with the Commonwealth Government and telecommunications carriers to ensure that there are appropriate arrangements, via existing services or alternatives, for communities to stay connected for 72 hours without network power supply. |
| REC349-4673 | 39 - Disaster Risk Management | The Victorian Government advocates for stronger telecommunications service reliability outcomes from the Australian Government, and associated telecommunications reviews. |
| REC349-4666 | 39 - Disaster Risk Management | Distribution businesses annually attest to the Minister for Energy and Resources. The attestation should include specific reference to, but not limited to: Review of emergency management practices including but not limited to review of risks and risk controls and testing of revised controls following all major events and exercises. |
| Rec-ID | Code | Recommendation |
|---|---|---|
| REC348-4652 | 38 - Agency/Department Reporting | The Inspector-General of Emergency Management recommends that the Queensland Reconstruction Authority continues to engage with councils in the development of their local resilience action plans including to identify local needs with respect to communication, connectivity, and power in suitable hubs. |
| Rec-ID | Code | Recommendation |
|---|---|---|
| REC346-4637 | 37 - Funding | The committee recommends that the Australian Government increase the Disaster Ready Fund to $400 million per annum for investment in disaster mitigation and resilience measures. |
| Rec-ID | Code | Recommendation |
|---|---|---|
| REC345-4631 | 38 - Agency/Department Reporting | The National Emergency Management Agency document its consideration of Crisis Arrangements Committee advice on gaps and priorities for whole-of-government exercising, as well as the annual analysis undertaken to review and update the list of identified hazards under AGCMF, to inform the development of the annual national exercise program. This should include ensuring that exercises consider both natural and all-hazard scenarios. |
| REC345-4627 | 38 - Agency/Department Reporting | The Department of the Prime Minister and Cabinet: |
| Rec-ID | Code | Recommendation |
|---|---|---|
| REC342-4581 | 37 - Funding | That the Victorian Government prioritise investment in betterment projects to improve the resilience of mitigation infrastructure, and in doing so work with the Commonwealth Government to achieve this goal. |
| REC342-4609 | 37 - Funding | That the Victorian Government pay its bills on time, especially following natural disasters. |
| REC342-4574 | 39 - Disaster Risk Management | That the efficacy and impact of the Flemington Racecourse flood wall be considered as part of Melbourne Water’s review of mitigation in the Maribyrnong River catchment announced following the updated flood modelling. |
| REC342-4580 | 37 - Funding | That the Victorian Government work with the Commonwealth Government to ensure the Disaster Recovery Funding Arrangements are not unduly burdensome. |
| REC342-4604 | 37 - Funding | That the Victorian Government evaluate the criteria and funding arrangements for financial assistance post-disaster with a view to: |
| REC342-4573 | 39 - Disaster Risk Management | That the Victorian Government ensure that major flood mitigation measures be assessed and reviewed to ensure they perform as intended. |
| REC342-4549 | 37 - Funding | That the Victorian Government ensure regional catchment management authorities, with local councils, are funded and resourced to conduct and implement up to date flood studies on a regular basis. |
| REC342-4603 | 37 - Funding | That the Victorian Government simplify the application process for disaster recovery funding. This could include reducing paperwork, providing hands-on assistance and investigating technology to streamline processes. |
| REC342-4571 | 39 - Disaster Risk Management | That the Victorian Government fund the pilot of a ring levee development program in Northern Victoria to protect house and curtilage in flood-prone areas. |
| REC342-4612 | 39 - Disaster Risk Management | That the Victorian Government develop community-based initiatives and resource-sharing mechanisms, fostering resilience and solidarity among towns facing challenges from environmental disasters. These should ensure timely and effective responses to future crises, leveraging collective strength and kindness to aid in the recovery process. |
| REC342-4591 | 37 - Funding | That the Victorian Government increase funding for training of volunteers to boost the capacity of State Emergency Service units and Shepparton and Echuca and Moama Search and Rescue squads to respond during emergencies. |
| REC342-4577 | 39 - Disaster Risk Management | That the Victorian Government ensure that the state’s existing culvert infrastructure in high-risk flood areas is fit for purpose, and that the Government also consult with local councils and other relevant stakeholders and prioritise betterment in any upgrade works deemed necessary. |
| REC342-4582 | 37 - Funding | That the Victorian Government adapt policies and funding models to prioritise betterment initiatives, including ensuring that financial resources are allocated effectively to meet long-term needs of at-risk communities, and in doing so work with the Commonwealth Government to achieve this goal. |
| REC342-4575 | 39 - Disaster Risk Management | That the Victorian Government further investigate options for increasing outlet capacity at Lake Eppalock. This investigation should involve: |
| Rec-ID | Code | Recommendation |
|---|---|---|
| REC341-4541 | 37 - Funding | The NSW Reconstruction Authority repurpose the funding previously provided for one-off spontaneous volunteering grants to each local council to support a more comprehensive, targeted approach to building community capability to support informal volunteering comprised of: |
| Rec-ID | Code | Recommendation |
|---|---|---|
| REC340-4524 | 38 - Agency/Department Reporting | That the Australian Government task the Climate Change Authority with a regular review of the National Climate Service against the KPIs |
| REC340-4523 | 38 - Agency/Department Reporting | That the Australian Government regularly monitor against the new Statement of Expectations (refer Recommendation 4.1 and KPIs in Box 7) to ensure the National Climate Service is meeting expectations. |
| REC340-4507 | 38 - Agency/Department Reporting | That the Australian Government publish all National Climate Service strategic documents by default to provide transparency on the National Climate Service’s program and timelines for implementation. |
| REC340-4506 | 38 - Agency/Department Reporting | That the Australian Government require the National Climate Service to develop and publish a climate services roadmap, describing how to build to a national capability with explicit and ambitious time frames. |
| REC340-4493 | 37 - Funding | That the Australian Government ensure the National Climate Service has adequate budget allocation to reasonably meet escalating needs for a national climate service capability. |
| REC340-4505 | 38 - Agency/Department Reporting | That the Australian Government deliver National Climate Risk Assessments through the National Climate Service on a regular program, aligned to the Intergenerational Report. |
| REC340-4526 | 38 - Agency/Department Reporting | That the Australian Government establish a mechanism within the National Climate Service to track user experience and satisfaction which gathers user needs and preferences, to guide the development of future products and services. |
| Rec-ID | Code | Recommendation |
|---|---|---|
| REC339-4460 | 38 - Agency/Department Reporting | The Committee recommends that insurers report case management key performance indicators to the Australian Securities and Investments Commission. |
| REC339-4468 | 37 - Funding | The Committee recommends that the Australian Government continue to work with the states and territories through National Cabinet to ensure that disaster and resilience funding, and non-financial support, are accessible and adequate for all councils, particularly smaller councils. The Committee recommends that the Government work with the states and territories through National Cabinet to ensure more disaster support can be triggered at the sub-Local Government Area level when needed. |
| REC339-4477 | 37 - Funding | The Committee recommends that a climate financing framework be developed in relation to government mitigation and adaptation funding. That this framework create the appropriate incentives for both public sector and private sector investment in mitigation and more resilient buildings and infrastructure. This would include: |
| REC339-4458 | 38 - Agency/Department Reporting | The Committee recommends that for each declared event, insurers be required to report the number of unresolved cases after 12 months to the Australian Securities and Investments Commission and the overarching strategy for resolving these cases. This report should include the total number of outstanding claims and the most common reasons for the delay. |
| REC339-4412 | 37 - Funding | The Committee recommends that the General Insurance Code of Practice provide that final cash settlements: |
| REC339-4476 | 37 - Funding | The Committee recommends the Australian Government continue to fund community level mitigation, ensuring at least $200 million per year ongoing. |
| REC339-4456 | 38 - Agency/Department Reporting | The Committee recommends the Australian Securities and Investments Commission publish quarterly insurer and brand level data on their performance on the metrics recommended in Recommendation 51. |
| REC339-4472 | 37 - Funding | The Committee recommends the Australian Government consider measures to improve the affordability of flood insurance for existing policyholders with high flood risk properties, including the appropriateness of a government supported reinsurance arrangement. Any interventions to improve the affordability of flood insurance should be pursued in accordance with to the following interdependent principles: |
| REC339-4453 | 38 - Agency/Department Reporting | The Committee recommends that the Australian Securities and Investments Commission develop and define key outcomes measures for the consumer experience, including: |
| REC339-4479 | 39 - Disaster Risk Management | The Committee recommends the Australian Government consider measures to reduce household level risks, including whether it would be appropriate to extend the Bushfire Resilience Rating Home Self-Assessment App to flood risks. |
| REC339-4471 | 37 - Funding | The Committee acknowledges the increased funding for the community legal sector recently announced. While the focus of this funding will be for family violence services, the Committee recommends that an appropriate proportion be dedicated to natural disaster services. |
| REC339-4469 | 37 - Funding | The Committee recommends a more flexible approach to post-flood grant arrangements, to expand eligibility to include some insured people, including: |
| Rec-ID | Code | Recommendation |
|---|---|---|
| REC338-4395 | 37 - Funding | The committee recommends that the Disaster Recovery Funding Arrangements be amended to set aside a proportion of funding to be offered to local governments up-front to help facilitate disaster recovery and resilience to ensure councils do not always have to bear the burden of financing repairs up-front. |
| REC338-4393 | 37 - Funding | The committee recommends that the Disaster Recovery Funding Arrangements and relevant guidelines be amended to enable funds to be distributed for the purpose of building betterment into recovery and reconstruction, ensuring that this funding is available to all jurisdictions. |
| Rec-ID | Code | Recommendation |
|---|---|---|
| REC337-4370 | 39 - Disaster Risk Management | The Commonwealth should lead the development of a Nation-wide Natural Disaster Risk Profile (Risk Profile) to enable the Commonwealth to identify risk reduction and resilience priorities and allow the Commonwealth, states, and territories to address agreed risk. The Risk Profile should: |
| REC337-4392 | 37 - Funding | Disaster funding investments should elevate the role of local First Nations leadership in emergency management through formal recognition and resourcing for their actions and decision-making during disasters. |
| REC337-4376 | 39 - Disaster Risk Management | In compiling the Risk Profile, the Commonwealth should draw upon existing activities including, but not limited to, the National Climate Risk Assessment and the High-Risk Weather Season Outlook. |
| REC337-4363 | 37 - Funding | When designing disaster management outcomes for First Nations communities, the Commonwealth should consider flexible funding arrangements to support community self-determination towards disaster preparedness, risk reduction and resilience as part of the Outcomes Policy. |
| REC337-4383 | 37 - Funding | The Commonwealth should clarify and more narrowly define an exceptional circumstances consideration (currently Category D). This should include: |
| REC337-4349 | 39 - Disaster Risk Management | The Department of the Prime Minister and Cabinet (PM&C), jointly with the CoordinatorGeneral of National Emergency Management Agency (NEMA), should co-chair a coordination mechanism between Commonwealth departments and agencies to promote natural disaster risk reduction and resilience. |
| REC337-4389 | 37 - Funding | The Commonwealth should prioritise the redirection of AGDRP funding, which occurs because of a refined role, towards natural disaster resilience and risk reduction program/s. |
| REC337-4374 | 39 - Disaster Risk Management | The Commonwealth should mandate regular capability assessments of local governments by state and territory governments. |
| REC337-4362 | 37 - Funding | The Commonwealth should ensure that the Outcomes Policy includes outcomes that directly reference disadvantaged or disproportionately impacted groups to ensure their needs are appropriately considered by disaster funding programs. |
| REC337-4382 | 37 - Funding | The Commonwealth should remove existing current DRFA Category A, B, C, and D and negotiate their replacement with a criteria framework that categorises measures into short- (or immediate), medium-, and long-term recovery initiatives and groups initiatives according to their domain (natural, social, economic and built). |
| REC337-4388 | 37 - Funding | The intent of the AGDRP should be refined to clarify its role in the disaster management funding system. This should be achieved through: |
| REC337-4373 | 39 - Disaster Risk Management | To support a comprehensive risk-based approach, the Commonwealth should require state and territory governments to develop local or regional Disaster Management Plans. These Disaster Management Plans should: |
| REC337-4358 | 37 - Funding | The Outcomes Policy should: |
| REC337-4381 | 37 - Funding | The Commonwealth should clarify the role of the DRFA in the current Commonwealth disaster arrangements. This should be achieved through: |
| REC337-4387 | 37 - Funding | The Commonwealth should reconsider, with a view to increasing, the current amount of funding allocated to the DRF, or other similar future programs, to address the disaster risk reduction and resilience priorities identified by the Risk Profile. |
| REC337-4372 | 39 - Disaster Risk Management | The Commonwealth should require state and territory governments to complete complementary disaster risk assessments to inform the Risk Profile and guide priority areas for Commonwealth investment and support. Where they exist, climate risk or adaptation profiles developed at local, state and Commonwealth levels should be used to inform the Risk Profile. |
| REC337-4355 | 37 - Funding | The Commonwealth should ensure that all non-self-governing Australian territories are clearly eligible for financial support during and after a natural disaster. Specific reference to external Commonwealth territories should be included in the DRFA, and appropriate triggers for support should be included in all other natural disaster funding related programs. |
| REC337-4378 | 37 - Funding | To the extent possible, where programs are requested to be funded by the Commonwealth that have previously been agreed as part of the Risk Profile, thresholds and administrative arrangements should be streamlined to encourage pre-planning and a risk-based approach. |
| REC337-4386 | 37 - Funding | The DRF should be underpinned by an investment strategy that is informed by the Risk Profile. This should be done through: |
| REC337-4367 | 38 - Agency/Department Reporting | The Commonwealth should use reporting established by the Outcomes Policy to inform requirements associated with international obligations (e.g., the Sendai Framework for Disaster Risk Reduction). |
| REC337-4371 | 39 - Disaster Risk Management | The Commonwealth should develop an agreed methodology to underpin the Risk Profile that would identify at-risk communities, capabilities, and assets. |
| REC337-4346 | 37 - Funding | The Commonwealth should prioritise nation-wide investment in disaster risk reduction and resilience initiatives. |
| REC337-4377 | 39 - Disaster Risk Management | The Commonwealth should use the results of the Risk Profile to work with state and territory governments to identify and prioritise disaster funding. |
| REC337-4369 | 37 - Funding | The Commonwealth should adopt an evidence-informed, risk-based approach to Commonwealth disaster funding. |
| REC337-4384 | 37 - Funding | The Commonwealth should review the existing DRFA cost sharing arrangements with state and territory governments, taking into consideration simplicity, equity and the capacity of the individual state and territory governments. Consideration should be given to the appropriate thresholds, reimbursement rates and whether insurance costs should be taken into consideration when determining thresholds. |
| REC337-4366 | 38 - Agency/Department Reporting | The Commonwealth should embed regular sharing of lessons learnt from program outcomes between state and territory governments, and the Commonwealth, to develop a continuous improvement culture. |
| Rec-ID | Code | Recommendation |
|---|---|---|
| REC335-4473 | 37 - Funding | The Committee recommends that the Australian Government strengthen procurement project specifications under the new Federation Funding Agreements Schedule for state and territory government co-funded project proposals to include minimum or preferred requirements for the use of innovative road asset technologies and recyclable materials and methodologies to enable sustainable long-term asset resilience and support a circular economy. |
| REC335-4462 | 37 - Funding | The Committee recommends that the Australian Government review funding allocation to support road asset maintenance works under its Infrastructure Investment Program and consider other measures to incentivise increased investment in maintenance works. |
| REC335-4459 | 38 - Agency/Department Reporting | The Committee recommends that the Australian Government propose that road asset infrastructure resilience planning and investment frameworks be made a standing item on the Infrastructure and Transport Senior Officials’ Committee meeting agenda. |
| REC335-4472 | 37 - Funding | The Committee recommends that the Australian Government strengthen procurement requirements under the new Federation Funding Agreements Schedule on transport infrastructure for state and territory government cofunded project proposals to incorporate resilience design, minimum road construction requirements, and performance specifications to enable sustainable long-term resilience over an asset’s lifecycle. |
| REC335-4461 | 37 - Funding | The Committee recommends that the Australian Government establish a review into the distribution formula of the Financial Assistance Grants road component. |
| REC335-4460 | 39 - Disaster Risk Management | The Committee recommends that the Australian Government propose that the Infrastructure and Transport Senior Officials’ Committee, in consultation with Austroads and other relevant stakeholders, progress the development of national road infrastructure resilience guidelines to inform asset management and project investment. |
| REC335-4467 | 37 - Funding | The Committee recommends that the Australian Government investigate options to include flexibility to fund preparedness measures through Disaster Recovery Funding Arrangements to assist in mitigating against future disaster events. |
| REC335-4466 | 37 - Funding | The Committee recommends that the Australian Government implement options for greater flexibility for betterment funding for resilient infrastructure builds, where structural, economic or social benefits are identified, through Disaster Recovery Funding Arrangements eligibility criteria following natural disaster events |
| REC335-4465 | 37 - Funding | The Committee recommends that the Australian Government review the funding approval timeframes as part of the joint Australian-State and Territory Government Disaster Recovery Funding Arrangements. |
| REC335-4463 | 37 - Funding | The Committee recommends that the Australian Government, as part of the development of a Federation Funding Agreements Schedule on transport infrastructure, assess options to improve the alignment and coordination of funding programs and application and approval processes with state and territory partner-funded bodies. |
| Rec-ID | Code | Recommendation |
|---|---|---|
| REC334-4455 | 38 - Agency/Department Reporting | The National Emergency Management Agency establish monitoring and reporting arrangements that demonstrate performance against the Disaster Recovery Funding Arrangements’ principles. |
| REC334-4456 | 37 - Funding | The National Emergency Manaement Agency: |
| REC334-4454 | 38 - Agency/Department Reporting | The National Emergency Management Agency: |
| Rec-ID | Code | Recommendation |
|---|---|---|
| REC332-4448 | 39 - Disaster Risk Management | Melbourne Water should investigate long term sustainable flood mitigation options for the Maribyrnong River. |
| REC332-4447 | 39 - Disaster Risk Management | Melbourne Water should investigate the feasibility of installing one way valves on the outlets from the street and yard drainage from Evergreen Avenue (Rivervue Retirement Village). |
| Rec-ID | Code | Recommendation |
|---|---|---|
| REC331-4428 | 37 - Funding | To ensure that the LEMA Review leads to improved LEMA processes and outputs that are responsive to the needs and capacity of the WA LG sector, WALGA recommends that the Department of Fire and Emergency Services and SEMC approve and secure funding for a three-year LEMA Improvement Project to implement the LEMA Review improvement actions (August 2023 – August 2026). |
| Rec-ID | Code | Recommendation |
|---|---|---|
| REC330-4423 | 37 - Funding | Improved coordination between insurers and government is required when access to government disaster funding requires evidence of an insurance claim status. Improvements should focus on removing unnecessary information requirements, agreeing the format and nature of information required, and alignment on timeframes. |
| REC330-4425 | 39 - Disaster Risk Management | Improvements should be made to encourage investments in resilience and adaptation when rebuilding following a catastrophe or severe weather event (where this is cost-beneficial). This should involve coordination between government and the insurance industry to co-incentivise these investments to create mutually beneficial outcomes for the government, insurance industry and more importantly, the customer and their community. |
| Rec-ID | Code | Recommendation |
|---|---|---|
| REC329-4393 | 37 - Funding | The Inspector-General of Emergency Management recommends the following change to the way that Disaster Recovery Funding Arrangements are supported through Queensland’s Disaster Management Arrangements: |
| REC329-4392 | 39 - Disaster Risk Management | The Inspector-General of Emergency Management recommends the following changes to the ways that ‘resilience’ is reflected in Queensland’s Disaster Management Arrangements: |
| REC329-4386 | 39 - Disaster Risk Management | That the Queensland Reconstruction Authority leads state-level hazard and risk functions, including the design and delivery of a risk assessment tool that is locally appropriate, costeffective and fit for purpose. |
| Rec-ID | Code | Recommendation |
|---|---|---|
| REC328-4351 | 38 - Agency/Department Reporting | At least once each year, coinciding with the production of the ANRR, the National Cabinet should evaluate progress in bolstering national resilience. |
| REC328-4374 | 37 - Funding | Jurisdictions should also contribute resourcing to implement the priorities for action, such as contributions in-kind and other funding, proportionate to the size of the jurisdiction. Funding should not be sourced from the Disaster Ready Fund given the dependence local government has on that funding source. |
| REC328-4350 | 38 - Agency/Department Reporting | The Commonwealth together with the States and Territories should identify their shared high-level resilience objectives and develop indicators to monitor national progress in achieving them. The ANRR should also provide annual updates on progress in achieving the objectives. |
| REC328-4373 | 37 - Funding | The Commonwealth should allocate a significant program budget to the Ministerial Council to enable effective implementation of its five national priorities for action. |
| REC328-4349 | 38 - Agency/Department Reporting | The ANRR should be a National Cabinet product focused on climate and disaster risk as well as other key resilience risks agreed by the Commonwealth and the jurisdictions. |
| REC328-4355 | 39 - Disaster Risk Management | Each NEMMM agenda should have a standing item on disaster risk reduction/resilience and at least one full meeting each year should be devoted to Disaster Resilience and Recovery. Some jurisdictions have established separate ministers responsible for recovery and resilience, and they should be invited to attend these recovery and resilience meetings. |
| REC328-4372 | 37 - Funding | In light of the fact that NEMA is a small agency with far fewer options than much larger government departments to reallocate resources for their Ministerial Council Secretariats, the Commonwealth should consider supplementing NEMA’s funding for this purpose. |
| REC328-4348 | 38 - Agency/Department Reporting | The First Secretaries, on behalf of the National Cabinet, should oversee (via a subordinate Deputy Secretaries Group) the development of an annual Australian National Resilience Report (ANRR) that combines the Ministerial Council resilience reporting, existing resilience strategies in jurisdictions and new initiatives. |
| REC328-4354 | 39 - Disaster Risk Management | NEMMM’s leading role in the wider national resilience effort should focus on disaster risk reduction, and it should engage as a core stakeholder in a wider range of other resilience issues. It should further elaborate this focus with respect to: |
| REC328-4359 | 38 - Agency/Department Reporting | NEMMM’s Terms of Reference should be amended to reflect the recommendations above. |
| REC328-4365 | 37 - Funding | The Commonwealth should allocate a significant budget to ANZEMC to support implementation of the NEMMM’s five priorities for action. The States and Territories should contribute as well, with their support, such as contributions in-kind and other resourcing, proportionate to the size of the jurisdiction. |
| REC328-4353 | 38 - Agency/Department Reporting | The next iteration of NEMMM’s Five Priorities for Action should be explicit and measurable, bold but achievable and focused on national outcomes, rather than outputs. They should: |
| Rec-ID | Code | Recommendation |
|---|---|---|
| REC327-4349 | 38 - Agency/Department Reporting | By December 2023, the Rural Fire Service should: develop performance measures to assess the performance and capabilities of the fleet in each RFS District by recording and publicly reporting on: fire response times and fire response outcomes; and, completions of fire hazard reduction works. |
| REC327-4348 | 38 - Agency/Department Reporting | By December 2023, the Rural Fire Service should: report annually on fleet allocations to RFS Districts, and identify the ways in which fleet resources align with district-level fire risks |
| Rec-ID | Code | Recommendation |
|---|---|---|
| REC325-4330 | 38 - Agency/Department Reporting | The Inspector-General of Emergency Management recommends Queensland Fire and Emergency Services review the Queensland Emergency Alert Manual – M.1.174 in its entirety by 1 November 2023. The manual should specifically address the authorising environment, legislative obligations and the capability and complexities of the Emergency Alert system. |
| REC325-4330 | 38 - Agency/Department Reporting | The Inspector-General of Emergency Management recommends Queensland Fire and Emergency Services review the Queensland Emergency Alert Manual – M.1.174 in its entirety by 1 November 2023. The manual should specifically address the authorising environment, legislative obligations and the capability and complexities of the Emergency Alert system. |
| REC325-4339 | 38 - Agency/Department Reporting | The Inspector-General of Emergency Management recommends that Queensland Fire and Emergency Services review and update the State Disaster Risk Report, including re-evaluating the risk of flooding by all types. Queensland Fire and Emergency Services should publish the updated State Disaster Risk Report by 1 November 2023. |
| Rec-ID | Code | Recommendation |
|---|---|---|
| REC324-4303 | 39 - Disaster Risk Management | Risk-based approach to calculating flood planning: That, to take account of greater knowledge of climate change, Government reinforce its adoption of a risk-based approach to calculating the flood planning level for planning purposes and, through the NSWRA, immediately start a process of revising all flood planning level calculations in the state’s high-risk catchments. Flood planning level re-determinations for all high-risk catchments should be completed within 3 years. These revised flood planning levels will need to be factored into all development applications (in-progress and new) in those high-risk catchments. The risk profile of high-risk catchments should be revisited at appropriate time intervals to check that levels are current. A review should take place if there has been a significant trigger event (i.e. changed rainfall, development) or at least every 5 years. As well as reviewing the flood planning level, this 5-yearly review should include reviewing any floodplain lease conditions and adjusting them as necessary in the light of better knowledge of climate change impacts. In working out a tolerable, risk-based flood planning level, consideration should be given to the PMF, 1% AEP, 0.02% AEP, existing development, approved but not yet constructed developments, and existing and approved but not yet constructed evacuation routes. |
| REC324-4305 | 39 - Disaster Risk Management | Cost benefit framework:That, to enable a more systematic prioritisation of investment options in risk mitigation before, during and immediately following a natural disaster event, Government adopt and utilise a Disaster Cost Benefit Framework. This Framework will enable Government to estimate the investment required for any given disaster, starting with flood events, and will enable the fast allocation of funding based on detailed and rapid analysis of flood and property modification, mitigation, preparation, response and finance related options including: |
| REC324-4298 | 37 - Funding | Housing and development funding options: That, to empower vulnerable people and communities to avoid significant impacts from flood as well as drive broader investment in adaptation, Government through NSWRA: |
| Rec-ID | Code | Recommendation | |
|---|---|---|---|
| REC323-4261 | 37 - Funding | That the NSW Government advocate through the National Cabinet to widen eligibility under the Disaster Funding Recovery Arrangements to allow local councils to build back better. |
|
| REC323-4281 | 37 - Funding | That the NSW Government allocate funding to the improvement of the Pitt Town Evacuation Route and other key possible evacuation routes in Sydney's northwest. |
|
| REC323-4270 | 37 - Funding | That the NSW Government consider entering into a service agreement with an organisation that has the resources and capacity to manage donations and activate quickly during natural disasters. |
|
| REC323-4272 | 37 - Funding | That the NSW Government ensure that flood affected individuals can continue to access financial assistance for as long as there is demonstrated need. |
|
| REC323-4279 | 37 - Funding |
|
|
| REC323-4280 | 37 - Funding | That the NSW Government work with local governments to identify alternative routes to vulnerable roads, and that the NSW and Australian Governments fund the construction of these important routes to improve evacuation and access options in times of disaster. |
|
| REC323-4258 | 39 - Disaster Risk Management | That the NSW Government significantly increase its investment in flood mitigation and preparation, including its support of local governments to do the same, by: • increasing ongoing, long term funding and access to technical guidance and assistance for local councils • ensuring that land-use planning and development takes a risk-based approach. |
| Rec-ID | Code | Recommendation |
|---|---|---|
| REC321-4208 | 38 - Agency/Department Reporting | We recommend that DEWLP and CFA (in consultation with FRV) develops financial reporting to monitor fuel management costs and estimate future costs. |
| REC321-4209 | 38 - Agency/Department Reporting | We recommend that DEWLP and CFA (in consultation with FRV) systemically documents and publicly reports reasons why it does not complete planned burns. |
| Rec-ID | Code | Recommendation |
|---|---|---|
| REC318-4177 | 38 - Agency/Department Reporting | The Inspector-General for Emergency Management recommends that the Department of Environment, Land, Water and Planning (or the single entity referenced in Recommendation 4) – in conjunction with legislated fuel management organisations – develop a common set of objectives, metrics and reporting requirements for fuel management that form part of a compulsory regime that enables the Victorian Government to report publicly on a holistic fuel management program. The reporting requirements should: |
| Rec-ID | Code | Recommendation |
|---|---|---|
| REC317-4062 | 39 - Disaster Risk Management | The National Disaster Risk Information Services Capability should include tools and systems to support operational and strategic decision making, including integrated climate and disaster risk scenarios tailored to various needs of relevant industry sectors and end users. |
| REC317-4061 | 39 - Disaster Risk Management | Australian, state and territory governments should support the implementation of the National Disaster Risk Information Services Capability and aligned climate adaptation initiatives. |
| REC317-4057 | 39 - Disaster Risk Management | The Australian Government should establish a standing entity that will enhance national natural disaster resilience and recovery, focused on long-term disaster risk reduction. |
| REC317-4103 | 39 - Disaster Risk Management | Australian, state and territory governments should develop arrangements that facilitate greater inclusion of primary healthcare providers in disaster management, including: representation on relevant disaster committees and plans and providing training, education and other supports. |
| REC317-4129 | 37 - Funding | Australian, state and territory governments should create simpler Disaster Recovery Funding Arrangements application processes. |
| REC317-4079 | 39 - Disaster Risk Management | Australian, state and territory governments, in consultation with local governments and the private sector, should review supply chain risks, and consider options to ensure supply of essential goods in times of natural disasters. |
| REC317-4128 | 37 - Funding | Australian, state and territory governments should broaden Category D of the Disaster Recovery Funding Arrangements to encompass funding for recovery measures that are focused on resilience, including in circumstances which are not ‘exceptional’. |
| REC317-4067 | 39 - Disaster Risk Management | State and territory governments should have a structured process to regularly assess the capacity and capability requirements of fire and emergency services, in light of both current and future natural disaster risk. |
| REC317-4125 | 37 - Funding | Australian, state and territory and local governments should develop greater consistency in the financial support provided to individuals, small businesses and primary producers under the Disaster Recovery Funding Arrangements. |
| Rec-ID | Code | Recommendation |
|---|---|---|
| REC316-4048 | 37 - Funding | Government consider adopting a similar model to NSW for the management of emergency costs and reimbursements within ACT Government agencies. |
| REC316-4047 | 37 - Funding | Government consider an alternative funding arrangement for extraordinary costs borne by Government agencies in combating emergencies such as bushfires. |
| Rec-ID | Code | Recommendation |
|---|---|---|
| REC315-3809 | 37 - Funding | That Government work with other Australian governments to provide long-term funding certainty to AFAC, including the National Resource Sharing Centre (NRSC) and the National Aerial Firefighting Centre (NAFC). |
| REC315-3830 | 39 - Disaster Risk Management | That as a matter of urgency, in order to accelerate and finalise a State-wide strategic fire trail network, the NSW RFS Commissioner and Bush Fire Coordinating Committee (BFCC): |
| REC315-3825 | 39 - Disaster Risk Management | That Government, acknowledging that a strategic approach to planning for bush fire will take time, and in order to protect, prepare and build resilience into existing communities better, should immediately: |
| Rec-ID | Code | Recommendation |
|---|---|---|
| REC313-2512 | 38 - Agency/Department Reporting | Documenting results and recommendations from disaster recovery tests. |
| Rec-ID | Code | Recommendation |
|---|---|---|
| REC311-2497 | 39 - Disaster Risk Management | To increase shared understanding of risks, ensure the coordination of plans and manage risks, dam failure for Paradise Dam be included as a separate risk within the Bundaberg District Disaster Management Plan (DDMP). |
| REC311-2492 | 39 - Disaster Risk Management | To increase understanding of hazards and manage risks, dam failure for Paradise Dam be included as a separate risk within the North Burnett Local Disaster Management Plan (LDMP). |
| REC311-2490 | 39 - Disaster Risk Management | To enable entities to have a shared understanding of forecast information for dam failure events during a flood, including flood wave travel time, speed and height, Emergency Action Plans contain protocols and responsibilities of relevant stakeholders for these aspects. |
| REC311-2499 | 39 - Disaster Risk Management | To ensure enhanced capability integration and enable timely community messaging Bundaberg LDMG in consultation with Sunwater develop additional Emergency Alerts and associated polygons for a Paradise Dam failure and load these on to the disaster management portal. |
| REC311-2498 | 39 - Disaster Risk Management | To enhance shared capacity and collaboratively manage risk, the Chair of the Bundaberg DDMG use the QERMF process to determine if dam failure for Paradise Dam should be reported as a residual risk in this instance due to known changes in the risk profile to: |
| Rec-ID | Code | Recommendation |
|---|---|---|
| REC310-2487 | 39 - Disaster Risk Management | The state’s arrangements for disaster management, including recovery, are articulated in the Disaster Management Act (2003), the Queensland Reconstruction Authority Act (2011), the State Disaster Management Plan and the Queensland Recovery Plan. To enable state-level arrangements to better support community-led recovery and to improve Queensland’s recovery governance |
| Rec-ID | Code | Recommendation |
|---|---|---|
| REC309-2472 | 38 - Agency/Department Reporting | A single point of truth be established for accurately capturing and reporting on disaster management group activation levels for any given timeframe. |
| Rec-ID | Code | Recommendation |
|---|---|---|
| REC308-2452 | 39 - Disaster Risk Management | Planning and warnings for storm tide should be based on modelling that shows the chances of an event occurring (probabilistic). |
| REC308-2458 | 39 - Disaster Risk Management | A strategy should be developed to improve the availability of information to decision-makers and other audiences. Information should be searchable, more specific, timely, and allow stake-holders to find what they want. |
| Rec-ID | Code | Recommendation |
|---|---|---|
| REC307-2436 | 39 - Disaster Risk Management | The outputs of these capabilities should be shared and actively inform the disaster management sector, including response operations and the creation of warnings and public messaging. |
| REC307-2428 | 39 - Disaster Risk Management | The future risk of bushfires to Queensland communities should be re-evaluated as part of the 2020 State Risk Assessment in light of recent and emerging science, events and lessons. |
| Rec-ID | Code | Recommendation |
|---|---|---|
| REC306-2423 | 37 - Funding | We recommend that, in the absence of stand-alone catchment management authorities, the Department of Infrastructure, Local Government and Planning as a matter of priority, establish what funding is reasonably required and complete all elements of the Brisbane River Catchment Flood Studies. |
| Rec-ID | Code | Recommendation |
|---|---|---|
| REC304-2407 | 39 - Disaster Risk Management | Discontinue the automatic allocation of Fire Warden powers to Council and Committee members and substitute an option for members to be appointed as Fire Wardens. |
| Rec-ID | Code | Recommendation |
|---|---|---|
| REC301-2392 | 39 - Disaster Risk Management | TFS should engage in discussions with government about the construction of purpose-built State Control Centre facilities for emergency management in Tasmania. |
| Rec-ID | Code | Recommendation |
|---|---|---|
| REC002-4012 | 38 - Agency/Department Reporting | Complete sets of daily-report books should be provided, and kept in the mine or office, to be overlooked by the Inspector during his periodical visits. |
| Rec-ID | Code | Recommendation |
|---|---|---|
| REC288-1194 | 37 - Funding | The Committee recommends the State Fire Commission be fully reimbursed for the costs of the State Emergency Service transfer in years 2014 to 2017. |
| Rec-ID | Code | Recommendation |
|---|---|---|
| REC286-1452 | 39 - Disaster Risk Management | Improve understanding of the allocation of ownership across government, business and individuals. |
| REC286-2095 | 37 - Funding | Investigate the costs and benefits of delivering a public education and awareness program. |
| REC286-1469 | 39 - Disaster Risk Management | Actively manage riparian vegetation to manage flood dynamics. |
| REC286-2049 | 39 - Disaster Risk Management | Pro-actively manage landslide areas. |
| REC286-1450 | 39 - Disaster Risk Management | Improve the understanding of the vulnerability of critical infrastructure. |
| REC286-2093 | 37 - Funding | Investigate the costs and benefits in enhancing the current Tsunami warning arrangements with signage and audible warning systems at key exposed locations (e.g. Port Arthur and Kingston Beach). |
| REC286-1468 | 39 - Disaster Risk Management | Identify and anlalyse the location of critical infrastructure within defined flood areas. |
| REC286-2017 | 39 - Disaster Risk Management | Improve maintenance of flood mitigation infrastructure. |
| REC286-2089 | 39 - Disaster Risk Management | Identify and analyse statewide storm hazard risk. |
| REC286-1448 | 39 - Disaster Risk Management | Utilise coastal mapping to assess need for coastal defences. |
| REC286-2092 | 37 - Funding | Ensure sufficient investment in controls across the PPRR spectrum with a focus on Prevention and Mitigation. |
| REC286-1463 | 39 - Disaster Risk Management | Develop enablers and capacity for Tasmanian earthquake risk owners. |
| REC286-2081 | 39 - Disaster Risk Management | Engage with industry bodies to explore opportunities to better understand and manage risks. |
| REC286-1447 | 39 - Disaster Risk Management | Assess vulnerability of ecosystems and species to coastal inundation. |
| REC286-2091 | 37 - Funding | Investigate the costs and benefits in enhancing the current Tsunami detection buoy network. |
| REC286-1461 | 39 - Disaster Risk Management | Review all hazards response and recovery plans to ensure they address likely earthquake consequences. |
| REC286-2066 | 39 - Disaster Risk Management | Advocate for an National Notifiable Diseases Database. |
| REC286-1455 | 39 - Disaster Risk Management | Assess options for managed coastal retreat. |
| REC286-1478 | 39 - Disaster Risk Management | Review environmental risks associated with hazardous uses within flood prone areas. |
| REC286-2056 | 39 - Disaster Risk Management | Review Ambulance Tasmania surge capacity. |
| Rec-ID | Code | Recommendation |
|---|---|---|
| REC285-2525 | 38 - Agency/Department Reporting | The report recommends that Ambulance Tasmania outline what KPIs are measured and provide targets or benchmarks to define what is good or poor performance. |
| REC285-2518 | 38 - Agency/Department Reporting | The report recommends that regional summary reports of clinical reviews be standardised to facilitate review and comparison across regions. |
| REC285-2517 | 38 - Agency/Department Reporting | The report recommends that Ambulance Tasmania collects data to allow regular and meaningful comparison of clinical outcomes at the regional level, to better allocate resources and to rapidly identify problems. |
| Rec-ID | Code | Recommendation |
|---|---|---|
| REC274-1405 | 37 - Funding | That the Department of Justice & Regulation broadens Budget Paper 3 response time measures to more comprehensively cover emergency responses to fires, rescues and other emergencies. |
| Rec-ID | Code | Recommendation |
|---|---|---|
| REC261-1492 | 37 - Funding | That the NSW Government commit to and fund a long term program of prescribed burning based on the recommendation of the 2009 Victorian Bushfires Royal Commission of an annual rolling target of a minimum of five per cent of public land per year, and that the NSW Government commit to extending the funding for the National Parks and Wildlife Service five year hazard reduction program past 2016. |
| Rec-ID | Code | Recommendation |
|---|---|---|
| REC256-1559 | 37 - Funding | The Australian Government should gradually increase the amount of annual mitigation funding it provides to state and territory governments to $200 million. Initially, this funding should be distributed to state and territory governments in accordance with the allocation under the National Partnership Agreement on Natural Disaster Resilience. |
| REC256-1558 | 37 - Funding | Funding to state and territory governments for community recovery should be provided as untied grants, with a transition period pending the development of a framework to assess community recovery costs. During the transition period, the Australian Government should continue to provide funding for community recovery through a reimbursement model. |
| REC256-1557 | 37 - Funding | Where asset management plans at the local, state or territory level pre-identify and cost betterment of assets (improving asset resilience to natural disasters), the Australian Government should share 50 per cent of the betterment component of reconstruction costs following damage from a (eligible) natural disaster. |
| REC256-1556 | 37 - Funding | The Australian Government should fund natural disaster recovery by: |
| REC256-1577 | 37 - Funding | The Australian Government should develop a formula for allocating mitigation funding to state and territory governments on the basis of where such funding is likely to achieve the greatest net benefits, taking into account the future risks of natural disasters. This should be completed within five years and in consultation with state and territory governments. |
| REC256-1560 | 37 - Funding | The Australian Government should: |
| Rec-ID | Code | Recommendation |
|---|---|---|
| REC255-1579 | 38 - Agency/Department Reporting | The ANAO recommends that the Department of Defence take steps to strengthen the priority afforded by Defence units to meeting these reporting requirements. |
| Rec-ID | Code | Recommendation |
|---|---|---|
| REC252-2571 | 38 - Agency/Department Reporting | St John Ambulance should develop quantitative performance targets for community paramedics and report these to Western Australia Health |
| REC252-2566 | 38 - Agency/Department Reporting | Western Australia Health should require service providers to report more comprehensive performance data using additional cost and clinical indicators |
| REC252-2565 | 38 - Agency/Department Reporting | Western Australia Health should include in contracts minimum standards for emergency and secondary ambulance services and effective mechanisms to monitor these |
| REC252-2564 | 37 - Funding | Western Australia Health should collate and centrally monitor financial data including the cost to government of IHPT |
| REC252-2563 | 37 - Funding | Western Australia Health should develop and agree with St John Ambulance a new funding model for emergency ambulance services focusing on standards, performance and allocation of risk |
| Rec-ID | Code | Recommendation |
|---|---|---|
| REC247-0932 | 37 - Funding | That the resources available to the Parks and Wildlife Service, to manage bushfire risk following the recent increase in land under its tenure, is reviewed. |
| Rec-ID | Code | Recommendation |
|---|---|---|
| REC245-2592 | 37 - Funding | That duplication of infrastructure be costed and taken into account when considering whether to proceed with the Whole of Government network. |
| Rec-ID | Code | Recommendation |
|---|---|---|
| REC244-2605 | 39 - Disaster Risk Management | A thorough consultative process be developed and implemented between the CFS and local government. This will determine how bushfire management planning can enable improved process and practice to mitigate bushfire risk, and ensure that fire permits are issued and complied with. |
| Rec-ID | Code | Recommendation |
|---|---|---|
| REC243-0838 | 37 - Funding | That the Government cease drawing from South Australia Police or other Community safety and emergency service budgets to fund the Directorate and instead merge its work and functions with the pre-existing South Australia Fire and Emergency Services Commission for zero total State and other Community safety and emergency service budget impact. |
| REC243-0835 | 37 - Funding | That the Government increase the budgets of all emergency services and community safety organisations, including: i. seeking Federal funding where appropriate (and assisting at no cost volunteer organisations with the grants application process); and ii. considering, with full public and cost benefit analysis, reviewing the effectiveness and efficiency of the Emergency Services Levy; and iii. consider including St John Ambulance Australia SA Ltd in the bodies to benefit from the Emergency services Levy if the funding of other Community Safety and Emergency services providers is improved in line with this recommendation. |
| Rec-ID | Code | Recommendation |
|---|---|---|
| REC242-2637 | 37 - Funding | That the Government increase the budgets of all emergency services and community safety organisations, including: |
| REC242-2650 | 37 - Funding | That the Government resume funding for the helicopter surveillance service rather than by fixed-wing aircraft along Adelaide, South Coast and other high-risk coastlines during summer recreational periods for monitoring shark and other rescue situations, to bring the State back into line with interstate best practice. |
| REC242-2648 | 37 - Funding | That the Government adequately fund Community Safety and Emergency Services budgets so that fire-bombing aircraft are available on call for rapid deployment throughout Autumn and Spring at short notice to bomb fires at the earliest and safest possible opportunity. |
| REC242-2640 | 37 - Funding | That the Government cease drawing from South Australia Police or other Community safety and emergency service budgets to fund the Directorate and instead merge its work and functions with the pre-existing South Australia Fire and Emergency Services Commission for zero total State and other Community safety and emergency service budget impact. |
| Rec-ID | Code | Recommendation |
|---|---|---|
| REC241-1035 | 37 - Funding | That the State Government contribution towards the purchase of operational vehicles is to be retained at 80 percent but that the District Inspector can recommend full Government subsidy of vehicles for Brigades experiencing financial hardship. |
| REC241-1034 | 37 - Funding | That the State Government contribution towards the construction of Brigade sheds be changed from $10,000 to a maximum of 25 percent, subject to the approval of the Deputy Chief Officer, Rural Fire Service Queensland. |
| REC241-1033 | 37 - Funding | When a local Rural Fire Brigade requests an equipment and maintenance levy from a local government authority, that authority will either supply the brigade’s equipment and maintenance costs or raise the requested levy. The amount to be collected is to be agreed between the local Brigade and the local government authority. |
| REC241-1032 | 37 - Funding | That the current Urban Fire Levy be changed to the Queensland Fire Levy. |
| Rec-ID | Code | Recommendation |
|---|---|---|
| REC240-2653 | 38 - Agency/Department Reporting | That the Department of Health publicly reports a comprehensive suite of performance information, including: |
| REC240-2652 | 38 - Agency/Department Reporting | That the Department of Health enhances management reporting processes over complaints by recording the number and nature of complaints, following up outstanding complaints formally and reporting complaints data to executive management. |
| Rec-ID | Code | Recommendation |
|---|---|---|
| REC239-2711 | 39 - Disaster Risk Management | That the Inspector General Emergency Management be empowered to provide an assurance to Government that the disaster management system is both appropriate and capable of dealing with complex events. |
| REC239-2684 | 38 - Agency/Department Reporting | The Chief Executive Officer Portfolio Business establishes a set of performance indicators to provide a transparent process for government to monitor its performance. |
| REC239-2682 | 37 - Funding | That a budget based on the desired functional accountabilities should be appropriated to the Portfolio Business as part of the Government budget process. |
| REC239-2692 | 39 - Disaster Risk Management | That the Queensland Police Service Disaster Management Unit is to be permanently located at the State Disaster Coordination Centre to work on a day to day basis with the proposed new Department of Fire and Emergency Services. |
| REC239-2674 | 38 - Agency/Department Reporting | That Queensland Corrective Service continues to develop its proposed recidivism index as a priority, including place and program based measures. |
| REC239-2681 | 37 - Funding | That the funding model for the Portfolio Business is not based on fee- for-service arrangements or notional contributions from the operational services. |
| REC239-2773 | 38 - Agency/Department Reporting | That should the Mobile Strategy in its current form be approved by government the CEO Portfolio Business and the Deputy Commissioner Operations: |
| REC239-2780 | 37 - Funding | That should the Westgate project proceed, that consideration must be given to opportunities to partner the investment with the private and public sectors. The business case should also consider alternative facilities such as Australian Defence Force sites. |
| REC239-2691 | 39 - Disaster Risk Management | That the Commissioners of Police and the Queensland Fire and Rescue Service review the current district disaster boundaries as a matter of urgency in-line with the findings and recommendations of the Auditor–General’s report into the Queensland disaster management system. |
| REC239-2673 | 38 - Agency/Department Reporting | That Queensland Corrective Service, in consultation with key partners in the criminal justice and social services sectors, develops specific performance indicators focused on efficiencies and customer/stakeholder outcomes across the criminal justice system. |
| REC239-2772 | 38 - Agency/Department Reporting | That the roll-out of the mobile service program business case mentioned earlier |
| REC239-2779 | 37 - Funding | That a new business case for Westgate project should be prepared by an independent party. |
| REC239-2771 | 38 - Agency/Department Reporting | That the Queensland Police Service Commissioner addresses the situation regarding statistical reporting. The Commissioner, in collaboration with the Chief Executive Officer Portfolio Business and the Queensland Fire and Rescue Service Commissioner should also examine the opportunity to acquire the services of a qualified and experienced Chief Information Officer or Chief Digital Officer in line with other Queensland and Australian government agencies. |
| REC239-2753 | 37 - Funding | That the proposed Chief Executive Officer Portfolio Business be responsible for developing a cost attribution model for portfolio agencies, including the Queensland Police Service, as a priority. |
| REC239-2774 | 39 - Disaster Risk Management | Those final determinations of disaster management districts include consultation with the Local Government Association Queensland, the Queensland Fire and Rescue Service and other Government departments. |
| REC239-2767 | 38 - Agency/Department Reporting | Recommendation: That the CEO Portfolio Business collaborates with the two portfolio Commissioners to: |
| REC239-2683 | 37 - Funding | That the Office of Portfolio Business follows the same budget processes as other agencies. |
| Rec-ID | Code | Recommendation |
|---|---|---|
| REC237-0834 | 37 - Funding | That the NSW Rural Fire Service apply for funding from the NSW Treasury for the development of a multi-agency business case for a BRIMS replacement that includes internal management, risk communication, community engagement capability and publishing activities on websites. |
| REC237-0833 | 37 - Funding | That the NSW Rural Fire Service and the NSW Treasury explore ways to ensure that unspent hazard reduction funds be carried over to the next financial year in a timely manner and to ensure that hazard reduction funding has a seamless transition from one financial year to the next. |
| Rec-ID | Code | Recommendation |
|---|---|---|
| REC236-2799 | 38 - Agency/Department Reporting | The committee recommends that the ATSB prepare and release publicly a list of all its identified safety issues and the actions which are being taken or have been taken to address them. The ATSB should indicate its progress in monitoring the actions every 6 months and report every 12 months to Parliament. |
| REC236-2791 | 37 - Funding | The committee recommends that the government develop a process by which the ATSB can request access to supplementary funding via the minister. |
| REC236-2808 | 38 - Agency/Department Reporting | The committee recommends that in relation to mandatory and confidential reporting, the default position should be that no identifying details should be provided or disclosed. However, if there is a clear risk to safety then the ATSB, CASA and industry representatives should develop a process that contains appropriate checks and balances. |
| REC236-2800 | 38 - Agency/Department Reporting | The committee recommends that where a safety action has not been completed before a report being issued that a recommendation should be made. If it has been completed the report should include details of the action, who was involved and how it was resolved. |
| Rec-ID | Code | Recommendation |
|---|---|---|
| REC234-2812 | 37 - Funding | In order to further build on the value for money review work being undertaken by the National Disaster Recovery Taskforce (on behalf of the Australian Government Reconstruction Inspectorate), the Australian National Audit Office (ANAO) recommends that the Taskforce: |
| REC234-2813 | 38 - Agency/Department Reporting | To strengthen its oversight of Queensland reconstruction progress, the Australian National Audit Office (ANAO) recommends that the National Disaster Recovery Taskforce: |
| REC234-2810 | 38 - Agency/Department Reporting | The Australian National Audit Office (ANAO) recommends that the Australian Government Reconstruction Inspectorate and the National Disaster Recovery Taskforce seek to maximise the benefits from their value for money review activities by obtaining more timely and comprehensive information on project progress and completion from the Queensland Reconstruction Authority, to enable the preliminary value for money assessments to be finalised based on the scope and cost of works that were actually delivered (rather than estimates). |
| Rec-ID | Code | Recommendation |
|---|---|---|
| REC231-2830 | 38 - Agency/Department Reporting | The Australian National Audit Office (ANAO) recommends that the Department of Regional Australia, Local Government, Arts and Sport improve its monitoring of the delivery of the Natural Disaster Recovery Work Plans for Queensland and Victoria by: |
| Rec-ID | Code | Recommendation |
|---|---|---|
| REC230-2835 | 37 - Funding | The committee recommends that the Australian Government direct an appropriate portion of the proceeds derived from the auction of spectrum to fund the allocation of 20 MHz of spectrum in the 700 MHz band for the purposes of a national public safety mobile broadband network. |
| Rec-ID | Code | Recommendation |
|---|---|---|
| REC229-2840 | 39 - Disaster Risk Management | The committee recommends relevant authorities work with community service organisations in both planning responses to and responding to extreme weather events, in particular those organisations that provide vital services to vulnerable groups. |
| Rec-ID | Code | Recommendation |
|---|---|---|
| REC228-1617 | 37 - Funding | The Territory and Municipal Services Directorate should annually (and on a cumulative basis) track and report on funds allocated for, and spent on, its Bushfire Operations Plan to the Minister for Police and Emergency Services. |
| REC228-1615 | 38 - Agency/Department Reporting | The Territory and Municipal Services Directorate, as part of its Bushfire Operations Plan monitoring and reporting, should assess and publicly report on cumulative progress against broader outcomes identified in the Regional Fire Management Plans and the Strategic Bushfire Management Plan. |
| REC228-1616 | 37 - Funding | The Territory and Municipal Services Directorate should enhance internal monitoring of its implementation of bushfire management activities and spending under the Bushfire Operations Plan by routinely reconciling figures in this plan with those in the Directorate’s corporate financial system. |
| Rec-ID | Code | Recommendation |
|---|---|---|
| REC222-1853 | 38 - Agency/Department Reporting | The Ministers for Emergency Services, Environment and Police ensure their departments include in their annual reports the expenditure they have incurred on preparing their staff for critical incidents, and for managing their response to these incidents. |
| REC222-1856 | 37 - Funding | The Ministers for Emergency Services, Environment and Police provide additional funds in the 2013-14 Budget so that the State’s emergency response agencies can implement a Psychological First Aid approach to preparing staff to deal with critical incidents and disasters, as is used in other Australian jurisdictions. |
| Rec-ID | Code | Recommendation |
|---|---|---|
| REC221-2861 | 38 - Agency/Department Reporting | Housing should further develop its Head Contractor key performance indicators to include quality, cost and tenant satisfaction. Currently performance reporting is focused entirely on timeliness indicators. |
| REC221-2862 | 38 - Agency/Department Reporting | Housing should use risk based analysis of its tenant and property information, job order data and quality assurance results to better inform target setting for KPIs, job order controls, and the sampling used for completed work inspections before and after payment. This analysis should synthesise information from all sources and include a risk assessment of tenants and properties, as well as consideration of the various types of maintenance work being done (emergency, priority and routine, and planned maintenance). |
| Rec-ID | Code | Recommendation |
|---|---|---|
| REC217-1842 | 37 - Funding | The state government review the current funding approach used for the operation, maintenance and upgrade of river gauges, with a view to improving the river gauge network. |
| REC217-1814 | 37 - Funding | The funding model for works on levees and their ongoing maintenance be revised, to be primarily based on the beneficiary pays principle. The state government should give consideration to wholly funding, or contributing to, the initial upgrade of high priority levees to an agreed standard. The construction of any new public levees will be the subject of a cost‐benefit analysis to be undertaken by DSE and the public authority, and be supported by a floodplain management study. Levees deemed low priority will be wholly the responsibility of the beneficiaries. |
| REC217-1826 | 39 - Disaster Risk Management | A revised Victoria Flood Management Strategy should identify and assign roles and responsibilities for the management and ongoing maintenance of Victoria’s waterways, for the purposes of flood protection and flood mitigation: |
| REC217-1845 | 37 - Funding | The state government should provide core, ongoing funding to the responsible authority for the FloodSafe community education program. Funding should be provided for education about prevention, response and recovery phases and include information on rates notices about the height of particular floods. |
| Rec-ID | Code | Recommendation |
|---|---|---|
| REC215-1877 | 39 - Disaster Risk Management | Regulators can help to achieve improved outcomes by considering the issues identified by this review |
| REC215-1876 | 39 - Disaster Risk Management | Fire services can improve outcomes by initiating discussions with landfill operators about fire management planning and emphasising the critical importance of water supplies and early intervention |
| Rec-ID | Code | Recommendation |
|---|---|---|
| REC210-0732 | 37 - Funding | Emergency Management Queensland should develop and implement a new formula for the distribution of its recurrent SES subsidy, which takes into account relevant factors including the size of a local SES contingent and the population, area and natural hazard risk profile of the local government area concerned. |
| Rec-ID | Code | Recommendation |
|---|---|---|
| REC209-1642 | 37 - Funding | That a cost benefit analysis of an integrated ICT desktop and portable capability including iPads and iPhones for all operational personnel be conducted. |
| REC209-1675 | 39 - Disaster Risk Management | PowerWater Corporation be consulted with the intention of establishing a Memorandum Of Understanding for the maintenance of PowerWater land for the purpose of coordinated fire reduction. |
| REC209-1674 | 39 - Disaster Risk Management | That the concession holder of the rail corridor be approached to formalise a Memorandum of Understanding for the maintenance of the railway corridor for the purposes of fuel load reduction. |
| REC209-1667 | 39 - Disaster Risk Management | Prepare a formal proposal for the creation of pastoral/Indigenous Lands Fire Management Teams. |
| REC209-1677 | 37 - Funding | A specialist investigation be conducted, using expertise from NT Treasury, to identify more appropriate ways to optimise the use of available funding for bushfire management. |
| REC209-1666 | 39 - Disaster Risk Management | Investigate the application and cost of the creation of District Coordination Officers to key high demand brigade districts. |
| REC209-1662 | 37 - Funding | Identify where Australian Government funding is available and apply for funding for integrating weed management, controlled burning, bushfire management and carbon farming initiatives. |
| Rec-ID | Code | Recommendation |
|---|---|---|
| REC207-2890 | 37 - Funding | Review and rebalance relative investment in long term climate modelling and medium-term seasonal outlook. |
| REC207-2889 | 37 - Funding | Review level of investment in research activities to free up budget and reduce pressure on computing capacity |
| REC207-2879 | 37 - Funding | Firm up approval processes and funding for any departures from provision of the basic product set |
| REC207-2882 | 39 - Disaster Risk Management | Review disaster recovery and business continuity plans. |
| REC207-2877 | 37 - Funding | Explore opportunities to re-phase investments in large scale projects and programs such as the Strategic Radar Enhancement Program, the NexGen Forecast and Warning System Products and the Improving Water Information Program. |
| REC207-2893 | 37 - Funding | Explore options to obtain revenue from advertising on the Bureau’s website |
| REC207-2892 | 37 - Funding | Apply a consistent cost-recovery model to all services delivered to state/territory fire agencies. |
| Rec-ID | Code | Recommendation |
|---|---|---|
| REC206-1892 | 37 - Funding | The Committee recommends that the Australian Government allocate additional and continuing funding in the 2012–2013 budget to the Insurance Law Service to establish a consumer advisory position at the Financial Services Ombudsman. The position should be co-funded by the Insurance Law Service and the insurance industry. |
| REC206-1891 | 37 - Funding | The Committee recommends that the Australian Government and relevant State and territory governments jointly allocate additional and continuing funding in the 2012–13 budget to the Insurance Law Service for the mobilisation of a temporary physical presence in areas of need following natural disasters. The service should be available to all persons in an affected disaster area and not subject to means-testing. |
| Rec-ID | Code | Recommendation |
|---|---|---|
| REC204-1912 | 38 - Agency/Department Reporting | The Board of Tourism WA should take action to ensure that it reviews the quality of Board papers that are submitted to it by the executive of Tourism WA. |
| REC204-1908 | 39 - Disaster Risk Management | As part of the current revision of its contract template for sponsorship agreements, Tourism WA should ensure that: |
| Rec-ID | Code | Recommendation |
|---|---|---|
| REC200-1725 | 37 - Funding | The State Government move the responsibility for the management and distribution of the Emergency Services Levy to the Department of Finance. |
| REC200-0385 | 37 - Funding | The State Government move the responsibility for the management and distribution of the Emergency Services Levy to the Department of Finance. |
| REC200-1722 | 39 - Disaster Risk Management | Emergency Management Western Australia and the State Emergency Management Committee amend WESTPLAN-BUSHFIRE to require State Emergency Coordination Group meetings to be held at the State Coordination Centre in West Leederville. |
| REC200-1698 | 39 - Disaster Risk Management | The Fire and Emergency Services Authority, the Department of Environment and Conservation and local governments jointly develop a single, integrated system for fuel load assessment and management. |
| Rec-ID | Code | Recommendation |
|---|---|---|
| REC193-0221 | 37 - Funding | Funding be sought to enable the State Fire Management Council to take a greater coordination role for bushfire risk management and mitigation. |
| Rec-ID | Code | Recommendation |
|---|---|---|
| REC192-1922 | 37 - Funding | The Committee recommends the provision of substantial funds to improve road infrastructure in the Mitcham Hills to be spent over the 2010/11, 2011/12, 2012/13 and 2013/14 budgets. |
| Rec-ID | Code | Recommendation |
|---|---|---|
| REC191-0274 | 37 - Funding | that the for Minister for Police, Corrective Services and Emergency Services undertake a thorough review, including consultation with rural fire brigades, regarding the proposed formula for distribution of funding. |
| REC191-0273 | 37 - Funding | that the for Minister for Police, Corrective Services and Emergency Services implement system of fire levies for landholders situated in urban, iZone and village brigade areas. |
| REC191-0266 | 37 - Funding | that QFRS cover the cost of annual vehicle inspection certificates for rural fire brigade registered vehicles. |
| REC191-0275 | 37 - Funding | that the for Minister for Police, Corrective Services and Emergency Services ensure that the formula for distribution of funding as recommended above allows rural fire brigades to control any donation or sponsorship funding raised by individual brigades. |
| Rec-ID | Code | Recommendation |
|---|---|---|
| REC190-1929 | 38 - Agency/Department Reporting | That the Queensland Reconstruction Authority consider extending the suite of internal performance indicators being used as the Authority matures. |
| Rec-ID | Code | Recommendation |
|---|---|---|
| REC185-1931 | 37 - Funding | The committee recommends that the Commonwealth Grants Commission ensures that as part of the current redesign of its data request, state and territory governments are required to include their past insurance and reinsurance receipts for natural disaster insurance premiums. These data must be taken into account by the Commission in determining the states' GST share. |
| Rec-ID | Code | Recommendation |
|---|---|---|
| REC181-0214 | 37 - Funding | The State replace the Fire Services Levy with a property-based levy and introduce concessions for low-income earners. |
| Rec-ID | Code | Recommendation |
|---|---|---|
| REC179-2977 | 38 - Agency/Department Reporting | The Department of Human Services should create evaluation guidelines for recovery operations, including links to planning. |
| Rec-ID | Code | Recommendation |
|---|---|---|
| REC177-3356 | 39 - Disaster Risk Management | The regulator should pre‐assess and review in a generic sense, and in conjunction with the offshore petroleum industry, available options for well control in the event of a blowout. Being ‘match fit’ in this sense will enable a quicker and more effective response in terms of safety assessment, and will ensure that expectations of both operator and regulator are more readily aligned. |
| REC177-3364 | 37 - Funding | The funding arrangements that support the National Plan should be reviewed to ensure that the costs associated with both preparedness and response capability are equitably shared between the shipping and offshore petroleum industries. |
| REC177-3290 | 38 - Agency/Department Reporting | The successful installation of every barrier should be the subject of written verification within and between licensees and rig operators; and should be the subject of explicit reporting to the relevant regulator(s). |
| REC177-3330 | 39 - Disaster Risk Management | Decision‐making about well control issues should be professionalised. Industry participants must recognise that decision‐makers owe independent duties to the public, not just their employer or principal, in relation to well control. Risk management in the context of well control needs to be understood as an ethical/professional duty. Self‐regulation contemplates self‐regulation by the industry, not just by individual licensees and operators. |
| REC177-3287 | 38 - Agency/Department Reporting | Licensees should be subject to an express obligation to inform regulators of problems which arise in the course of installing barriers, even if they consider that well integrity is not thereby compromised. The information should be provided by way of special report, rather than included in a standard reporting document (such as a DDR). The information provided should include risk assessment details. |
| REC177-3291 | 39 - Disaster Risk Management | Removal of a barrier must be the subject of consultation between licensees and rig operators prior to removal. A proper risk assessment should be carried out and agreed upon, and documented in writing before removal. Joint written certification as to the appropriateness of removal should take place before removal. Senior onshore representatives of stakeholder entities should be involved in that certification process. |
| REC177-3289 | 39 - Disaster Risk Management | The use/type of barriers (including any change requests relating thereto) must be the subject of consultation between licensees and rig operators prior to installation. A proper risk assessment should be carried out, agreed upon, and documented in writing before installation. Joint written certification as to the appropriateness of the use of particular barriers should take place before installation. Senior onshore representatives of stakeholder entities should be involved in that certification process. |
| REC177-3286 | 39 - Disaster Risk Management | Problems which arise in the course of installing barriers must be the subject of consultation between licensees, rig operators, and contractors (if used). A proper risk assessment should then be carried out and remedial steps (including further testing/verification) should be agreed upon, and documented in writing before the performance of remedial work whenever practicable. Joint written certification as to resolution of the problem should take place before resumption of drilling operations. Senior onshore representatives of stakeholder entities should be involved in that certification process. |
| REC177-3285 | 39 - Disaster Risk Management | Pre‐drilling assessments should include a risk assessment of the worst‐case blowout scenario. |
| Rec-ID | Code | Recommendation |
|---|---|---|
| REC176-0144 | 37 - Funding | Further Commonwealth funding for bushfire suppression be made conditional on state fire agencies agreeing to the Commonwealth evaluating and auditing their fuel reduction programs. |
| Rec-ID | Code | Recommendation |
|---|---|---|
| REC174-2984 | 39 - Disaster Risk Management | To improve Centrelink’s preparedness for responding to future disasters, the ANAO recommends that Centrelink include disasters that impact on multiple Areas in its emergency and business continuity test exercise program. |
| Rec-ID | Code | Recommendation |
|---|---|---|
| REC169-2998 | 38 - Agency/Department Reporting | Reports on the training exercises should be retained in an appropriately secured central repository so that consolidated results of the exercises can be drawn together effectively. |
| REC169-2997 | 38 - Agency/Department Reporting | The Department of Premier and Cabinet and Victoria Police, in consultation with departments, should standardise reporting on training exercises conducted under Part 6 of the Act and the CIP framework to promote greater consistency and to enable better identification of lessons learned and continuous improvement. |
| REC169-2989 | 38 - Agency/Department Reporting | The Department of Premier and Cabinet should lead the development of a performance management framework for measuring, monitoring and reporting on the implementation of Part 6 of the Act and the CIP framework. The framework should include key indicators, targets and reporting arrangements for assessing the extent to which departments, agencies and industry have fulfilled their obligations, as well as measures for monitoring achievement of joint objectives. |
| Rec-ID | Code | Recommendation |
|---|---|---|
| REC162-3016 | 37 - Funding | ESWG recommends investigation of options to fund NGERAC’s on-going activities including through AEMO’s funding model. |
| Rec-ID | Code | Recommendation |
|---|---|---|
| REC160-3045 | 38 - Agency/Department Reporting | The ANAO recommends that Centrelink: |
| REC160-3044 | 38 - Agency/Department Reporting | The ANAO recommends that the Business Continuity, Crisis Management and Security Sub committee: |
| REC160-3042 | 38 - Agency/Department Reporting | In order to identify key business processes and provide for the regular comparative assessment of Maximum Allowable Outage periods (MAOs), the ANAO recommends that Centrelink: |
| Rec-ID | Code | Recommendation |
|---|---|---|
| REC159-3050 | 38 - Agency/Department Reporting | ACTAS should log all emergency calls on CAD to document non-ambulance dispatch decisions, and to provide more complete data on demand. |
| REC159-3047 | 38 - Agency/Department Reporting | ACTAS should develop a comprehensive performance management framework that includes key performance indicators and targets aligned to its service delivery activities, to help inform management and stakeholders of its performance. |
| REC159-3062 | 38 - Agency/Department Reporting | ACTAS should develop a set of standards to measure and monitor patient satisfaction, so that improvements to the service can be made, based on patient satisfaction information. |
| REC159-3059 | 38 - Agency/Department Reporting | ACTAS should establish a clinical information database that: |
| REC159-3055 | 38 - Agency/Department Reporting | ACTAS should implement systems to enable the accurate collection and measurement of non-emergency ambulance service bookings to facilitate monitoring of performance and the provision of accurate advice to Government. |
| Rec-ID | Code | Recommendation |
|---|---|---|
| REC158-3449 | 37 - Funding | That port/channel managers are responsible for funding the preparation of marine emergency risk assessments and marine emergency response arrangements and ensuring the availability of identified marine resources in support of response to a marine emergency, to meet their statutory obligations. |
| REC158-3429 | 38 - Agency/Department Reporting | That the nominated marine safety authority is required to ensure that incident notification and data recording requirements for Victorian commercial ports are consistent and adhered to. |
| REC158-3451 | 37 - Funding | That port/channel managers should be able, within the general context of the pricing/cost recovery arrangements established under the Port Services Act 1995 and pricing determinations made by the Essential Services Commission, to recover the reasonable costs of meeting their statutory obligations (as per recommendation 26) through charges for prescribed service applied to port users. |
| REC158-3428 | 38 - Agency/Department Reporting | That the nominated marine safety authority, in consultation with the Emergency Services Commissioner and senior emergency services personnel, is responsible for monitoring the implementation and auditing against appropriate performance standards, risk management guidelines and good practice guidelines. |
| REC158-3450 | 37 - Funding | That emergency services are responsible for funding the development of the emergency services marine emergency response capacity/capability to meet their statutory obligations. |
| Rec-ID | Code | Recommendation |
|---|---|---|
| REC155-3476 | 38 - Agency/Department Reporting | That finalised Fire Operations Plans be made publicly available in their entirety (with the exception of any private information) on the Department of Sustainability and Environment’s website and in hard-copy, and that this requirement be clearly stated in future Codes of Practice. This should include the “district burns list”, or its future equivalents, and a map which shows the corresponding burns for each Fire District. Each map should be provided in a format which can be downloaded directly from the Department’s website without the need for further data manipulation by the user. An identical hardcopy version of the map for each Fire District should be also be available to members of the public on request and free of charge. |
| REC155-3468 | 38 - Agency/Department Reporting | That the Department of Sustainability and Environment, Department of Primary Industries, Parks Victoria & VicForests separately cost, and report, annual expenditure on fuel reduction burning, ecological burning and regeneration burning in their Annual Reports. |
| REC155-3470 | 37 - Funding | That the Victorian Government provide recurring funding for a significant increase in regionally-based, permanent, or long-tenured, fire management personnel dedicated to the prescribed burning program. The increase in personnel should be consistent with the level required to achieve an annual prescribed burning target of 385,000 hectares. |
| REC155-3467 | 38 - Agency/Department Reporting | The Department of Sustainability and Environment should report its performance against the increased prescribed burning target in its annual report, which should also include the following details: |
| REC155-3469 | 37 - Funding | That the Victorian Government establish a five year rolling fund which allows unused prescribed burning monies to be rolled over into future financial years for the purpose of subsequent prescribed burning activities. |
| REC155-3478 | 38 - Agency/Department Reporting | That all information pertaining to current and planned prescribed burns be published more prominently on the Department of Sustainability and Environment’s website, with a single prominent link to this material on the website homepage. |
| REC155-3477 | 38 - Agency/Department Reporting | That the details of any variation or amendment of a Fire Operations Plan, including: the carrying forward or postponement of burns within the three-year period covered by a Fire Operations Plan; the carry over, removal or rescheduling of burns between past, present and future Fire Operations Plans; and the alteration of burn boundaries (including alterations of less than 25 per cent); should appear on the Department of Sustainability and Environment’s website at the time of the change and be included in the Fire Operations Plan for the following year. |
| Rec-ID | Code | Recommendation |
|---|---|---|
| REC150-3125 | 38 - Agency/Department Reporting | QFRS introduce a system to collate and analyse performance information for use in management reporting and to support effective decision making processes. |
| Rec-ID | Code | Recommendation |
|---|---|---|
| REC149-3139 | 39 - Disaster Risk Management | The industry should develop in conjunction with the Regulator a process for addressing the need to maintain the risk profile of a facility moving into extended life operation at the same risk profile as when it was within design life. |
| REC149-3138 | 38 - Agency/Department Reporting | The current KPI measures used by the Regulator and industry need to be reassessed and the performance indicators need to be related to the risk profiles of the industry. The industry needs to develop the indicators, which need to be agreed and measured by the industry in discussion with other stakeholders. The KPI's selected should be published in comparison with the worldwide offshore industry and with other industries. NOPSA should continue discussions with Australian Safety and Compensation Council (ASCC) with a view to adopting their goals. |
| Rec-ID | Code | Recommendation |
|---|---|---|
| REC148-3149 | 38 - Agency/Department Reporting | That there be established the position of Inspector General of Horse Importation, the duties of that position being: |
| REC148-3184 | 37 - Funding | That the fees charged in relation to the importation and quarantining of horses be reviewed and fixed without delay having regard to the following factors: |
| REC148-3169 | 37 - Funding | That the budgets for airport reception of horses and government controlled and operated quarantine stations be determined so as to be sufficient to fund the operations of the Quarantine Stations in accordance with these recommendations and any further procedures and requirements that are laid down from time to time. |
| REC148-3178 | 38 - Agency/Department Reporting | That the officer responsible for the importation of horses prepare a report to the Executive Director of AQIS that: |
| REC148-3181 | 39 - Disaster Risk Management | That Biosecurity Australia undertake and complete within 12 months a non-regulated but formal import risk analysis relating to the importation of horses from the countries and regions from which Australia currently permits such importation, and make such recommendations for any changes to policies for importation as are warranted by its risk analysis to the officer responsible for the importation of horses and the Executive Director of AQIS. |
| REC148-3185 | 37 - Funding | That, until the review of those fees has been completed, the fee charged by the government controlled and operated quarantine stations for thoroughbred stallions temporarily imported into Australia be not be less than $165.00 plus GST a day and the fee for all other horses be not less than $65.00 plus GST a day. No discount is to be allowed for the number of horses in a consignment. |
| Rec-ID | Code | Recommendation |
|---|---|---|
| REC147-3186 | 38 - Agency/Department Reporting | The Australian National Audit Office (ANAO) recommends that, in order to assist management decision making and to inform Parliament about performance, Emergency Management Australia (EMA) develop and report appropriate measures for its key emergency management activities and outcomes. |
| REC148-3189 | 37 - Funding | The ANAO recommends that, to ensure that grant conditions are satisfied, EMA enhance procedures to monitor the progress of projects and follow up those behind schedule or not fulfilling funding agreement requirements. |
| Rec-ID | Code | Recommendation |
|---|---|---|
| REC145-3236 | 37 - Funding | The Committee recommends that the Australian Government provide funding support for the ongoing activities of the Australian Coastal Alliance in providing a national information and communication interface between research organisations and local government authorities and other coastal stakeholders. |
| REC145-3227 | 39 - Disaster Risk Management | The Committee recommends that coastal based Natural Resource Management bodies seeking funding under the Caring for our Country program have coastal and marine priorities, as well as coastal zone management principles integrated in their management plans. |
| REC145-3232 | 37 - Funding | The Committee recommends that the Australian Government give consideration to establishing a separate funding program for infrastructure enhancement in coastal areas vulnerable to climate change. Such funding should be provided according to a formula requiring contributions, either financial or in-kind, from state governments and relevant local government authorities. |
| REC145-3210 | 39 - Disaster Risk Management | The Committee recommends that the Department of Climate Change, in collaboration with the Queensland Government, CSIRO and Indigenous communities in the Torres Strait, undertake a major study into the vulnerability of the Torres Strait to the impacts of climate change and provide assistance in the development of an adaptation plan. |
| REC145-3207 | 37 - Funding | To further enhance Australia’s disaster mitigation, preparedness, response and recovery arrangements in the event of possible major coastal disasters, the Committee recommends that the Australian Government establish a grants program, the Coastal Natural Disaster Mitigation Program, to fund natural disaster mitigation projects in the Australian coastal zone. |
| REC145-3209 | 39 - Disaster Risk Management | The Committee notes that major initiatives relating to climate change adaptation risk assessment and infrastructure are currently in progress. Given that much of Australia’s infrastructure is in the coastal zone and the particular threats facing the coastal zone from climate change, involving significant socioeconomic costs, the Committee recommends that the Australian Government ensure there is a comprehensive national assessment of coastal infrastructure vulnerability to inundation from sea level rise and extreme sea level events. |
| REC145-3200 | 37 - Funding | The Committee recommends that the Australian Government: |
| REC145-3203 | 39 - Disaster Risk Management | The Committee recommends that: |
| Rec-ID | Code | Recommendation |
|---|---|---|
| REC143-3581 | 37 - Funding | That, in tandem with their consideration of local government cost sharing arrangements under WANDRA (refer Recommendation 1), the Fire and Emergency Services Authority and Main Roads Western Australia also establish ‘exceptional circumstances’ criteria to provide for additional assistance to local government where it may be warranted in order to avoid undue financial pressure caused by delays to secure reimbursement. |
| REC143-3576 | 37 - Funding | That Fire and Emergency Services Authority of Western Australia and Main Roads Western Australia, in consultation with the Western Australian Local Government Association, investigate a more equitable means of calculating the local government contribution to road and infrastructure restoration costs. In particular consideration should be given to regulations applying in the eastern states i.e. Queensland. |
| REC143-3589 | 37 - Funding | That consideration be given to the establishment of a ‘Heritage Reserve Fund’ that might underwrite urgent initial repairs to private heritage listed properties. |
| REC143-3586 | 37 - Funding | That the ‘opportunity cost’ for Local Authorities in meeting the 25% contribution to the restoration of eligible public assets damaged by a natural disaster event be considered when FESA and Main Roads Western Australia, in consultation with Western Australian Local Government Authority, investigate a more equitable means of calculating the local government contribution to road and infrastructure restoration costs as recommended in Recommendation 1. |
| REC143-3582 | 37 - Funding | That the Department of Treasury and Finance, in consultation with FESA, consider alternative funding arrangements to alleviate the need for FESA to ‘underwrite’ NDRA costs during the year. |
| Rec-ID | Code | Recommendation |
|---|---|---|
| REC140-3553 | 37 - Funding | RHH Neonatal Emergency Transport Service receive DHHS funding for a Senior Registrar to assume the responsibilities of retrieval staffing, quality assurance, data collection and reporting demands. |
| REC140-3552 | 37 - Funding | Department of Health and Human Services (DHHS) to fund 3 Full-Time Equivalent (FTE) Senior Registrar positions at the Royal Hobart Hospital (RHH) for the Tasmanian Medical Retrieval Service (TMRS). One registrar in the Anaesthesia Department, one in the Intensive Care Unit and one in Emergency Department is proposed. |
| REC140-3574 | 38 - Agency/Department Reporting | Formation of a subcommittee of the DHHS Tasmanian Medical Retrieval Services Committee to identify risk exposures, system problems and potential solutions. The subcommittee should review data, problem cases, system issues and generate a risk register. Meetings should occur at least quarterly. |
| REC140-3568 | 37 - Funding | The State Medical Retrieval Cost Centre (TMRS and NETS) be formed and be supported by the appropriate administrative and resource accountant expertise. This cost centre should be placed with those responsible for its management. |
| REC140-3567 | 37 - Funding | A uniform retrieval charge to the region of referral should be considered. This should be independent of the mode of transport used. |
| REC140-3554 | 37 - Funding | DHHS fund the equivalent of 2 FTE Consultant positions for retrieval duties (1.5 FTE existing, 0.5 FTE new) |
| Rec-ID | Code | Recommendation |
|---|---|---|
| REC139-3551 | 39 - Disaster Risk Management | The SA Country Fire Service to analyse the Coroner’s Report into the Wangary Bushfire 2005, and consider the relevant recommendations from this report in the implementation of the Ministerial Bushfire Management Review recommendations. |
| REC139-3549 | 39 - Disaster Risk Management | The SA Country Fire Service investigates the establishment of a Minister’s Bushfire Risk Management Reward Scheme. |
| Rec-ID | Code | Recommendation |
|---|---|---|
| REC136-3523 | 38 - Agency/Department Reporting | This Report should be considered for publication so that the insights, data, conclusions and recommendations are available within Queensland and other jurisdictions to assist with disaster management issues in the future. |
| Rec-ID | Code | Recommendation |
|---|---|---|
| REC129-3626 | 39 - Disaster Risk Management | We recommend that NSW Health continue with its good work and consider a more structured and systematic approach to the planning and risk assessment of major infectious diseases to assist transparency and decision making. |
| REC129-3622 | 39 - Disaster Risk Management | We recommend that NSW Health continue with its good work and consider building on influenza pandemic preparedness planning to develop broader contingency plans to address the emergence of other new, highly transmissible and/or severe infectious diseases. |
| REC129-3625 | 38 - Agency/Department Reporting | We recommend that NSW Health continue with its good work and establish a performance management framework with targets and indicators to assess progress in preparing for infectious disease emergencies. |
| Rec-ID | Code | Recommendation |
|---|---|---|
| REC128-3602 | 38 - Agency/Department Reporting | That the Department’s performance against tactical and strategic benchmarks be regularly reported in annual reports or animal and plant health emergency evaluation reports and compared to other jurisdictions where possible. |
| REC128-3604 | 37 - Funding | That the Department of Primary Industries restore the level of discretionary testing funds provided to District Veterinarians to previous levels and maintain these in the future in real terms. |
| REC128-3601 | 38 - Agency/Department Reporting | That, as a matter of principle, the NSW Government provide public reports on the lessons learned from emergency exercises which it manages or in which it participates. If necessary, such reports should exclude material which might jeopardise security. |
| REC128-3603 | 37 - Funding | That the Department of Primary Industries consider applying discretion to the use of user charging policies for testing in times when farm incomes are affected by external circumstances such as widespread drought. |
| REC128-3617 | 37 - Funding | That the Department of Primary Industries should provide specific information on levies to contributing producers through a separate document, rather than rely on standard audit documents and annual reporting requirements. |
| REC128-3619 | 38 - Agency/Department Reporting | That the Department of Primary Industries should ensure the roles and capacities of Rural Lands Protection Boards and industry are effectively monitored to enable assessment of the effectiveness of animal health programs. |
| REC128-3616 | 37 - Funding | That the Department of Primary Industries continue to pursue improvements to consultation with industry and accountability mechanisms to further build trust between industry and government, thereby enhancing the effectiveness of the OJD Program. |
| REC128-3605 | 38 - Agency/Department Reporting | That the Department of Primary Industries make every effort to meet its targets for the TSE program and encourage public and private sector veterinarians across the State to submit samples. The Department should include reports on its performance against these targets in annual reports. |
| REC128-3614 | 37 - Funding | The Committee encourages the Department and the Rural Land Protection Boards to discuss the need for funding of poultry surveillance activities in the context of reviewing the Memorandum of Understanding between the two parties. |
| Rec-ID | Code | Recommendation |
|---|---|---|
| REC126-1988 | 39 - Disaster Risk Management | That protocols and arrangements between the ACT and NSW require that each jurisdiction be fully involved in examining and planning for the threat posed by any fire likely to affect one or other jurisdiction and in coordinating the response to that fire |
| REC126-1986 | 39 - Disaster Risk Management | That the ACT and NSW authorities conduct a comprehensive risk analysis based on the most up to date knowledge relating to fire behaviour and spread in order to establish the degree of risk to each others' jurisdiction from fires ignitting in the other jurisdiction and to ensure that both jurisdictions remain fully informed and participate in risk assessments, the development of suppression strategies, and the development and dissemination of community information messages or warnings |
| REC126-1958 | 37 - Funding | That the ACT Government allocate sufficient funds to enable full-time and volunteer firefighters to participate in relevant courses and programs |
| REC126-1950 | 39 - Disaster Risk Management | That the Emergency Services Agency adopt a more rigorous risk management approach to incident management and prediction – with particular emphasis on the development of improved community information strategies and protocols |
| Rec-ID | Code | Recommendation |
|---|---|---|
| REC122-3778 | 37 - Funding | The Committee recommends that government consider options for assistance (including cost sharing) for farmers to fence native vegetation areas on private property affected by the Wangary fire. |
| Rec-ID | Code | Recommendation |
|---|---|---|
| REC121-3683 | 39 - Disaster Risk Management | RailCorp should undertake risk assessments of each of its activities as follows: |
| REC121-3723 | 38 - Agency/Department Reporting | All ATSB accident investigation reports should be made public. |
| REC121-3722 | 38 - Agency/Department Reporting | The ATSB should deliver any report of any such rail accident which it investigates to the Board of any rail organisation involved in the accident, ITSRR and the Minister for Transport Services. |
| REC121-3776 | 38 - Agency/Department Reporting | The Minister for Transport Services should retain, independently of ITSRR, safety auditors to provide a report to the Minister confirming or qualifying the contents of each such ITSRR quarterly report. |
| REC121-3712 | 38 - Agency/Department Reporting | RailCorp and ITSRR should co-operate with national programs for the collection, collation, trend analysis and dissemination of safety critical information. |
| REC121-3710 | 39 - Disaster Risk Management | The ITSRR should have permanent access to the RailCorp intranet. |
| REC121-3775 | 38 - Agency/Department Reporting | The Minister for Transport Services must table in Parliament, each such quarterly report by ITSRR. |
| REC121-3697 | 38 - Agency/Department Reporting | All train drivers’ defects reports should be entered by RailCorp into a computerised record and tracked to finalisation. |
| REC121-3700 | 39 - Disaster Risk Management | Maintenance plans on all trains should be revised annually. |
| REC121-3774 | 38 - Agency/Department Reporting | The ITSRR must provide a quarterly report to the Minister for Transport Services on the progress made by RailCorp in implementing these recommendations, including: |
| REC121-3684 | 39 - Disaster Risk Management | The ITSRR should conduct its own risk assessment in relation to the risk of any such high consequence, low probability accident and, if necessary, direct RailCorp to conduct a further risk assessment to reduce the level of residual risk to a level ITSRR regards as acceptable. |
| REC121-3729 | 38 - Agency/Department Reporting | All reports of the Chief Investigator of OTSI should be delivered, upon completion and without being reviewed, to ITSRR and the Minister for Transport Services. |
| Rec-ID | Code | Recommendation |
|---|---|---|
| REC119-3648 | 38 - Agency/Department Reporting | It is recommended that providers supply data to the Board: |
| Rec-ID | Code | Recommendation |
|---|---|---|
| REC117-3641 | 38 - Agency/Department Reporting | The ANAO recommends that, to ensure the outcomes of evaluations are effectively used to enhance the national counter-terrorism arrangements, the Attorney-General’s Department and the Department of the Prime Minister and Cabinet take appropriate measures to ensure: |
| REC117-3633 | 38 - Agency/Department Reporting | The ANAO recommends that, to provide better information to contribute to strategic assessments, decisions and reporting, the Attorney-General’s Department, with input and guidance from the Department of the Prime Minister and Cabinet: |
| REC117-3640 | 37 - Funding | The ANAO recommends that the Attorney-General’s Department better monitor and account for the expenditure of individual exercise costs under the National Capability Development Exercise Programme, through: |
| Rec-ID | Code | Recommendation |
|---|---|---|
| REC116-2104 | 39 - Disaster Risk Management | The Working Group recommends that in addition to existing disease control and pandemic management plans, States/Territories should consider developing a pandemic emergency management plan that considers the impact of pandemic disease broadly, encompasses all government and private sector agencies and addresses: |
| REC116-2127 | 39 - Disaster Risk Management | The Working Group recommends that the Australian Government and the States/Territories use the survey templates compiled in each of their jurisdictions during the capability review workshops, and the scenarios to consider their current and future capabilities, to respond to and recover from large scale disasters. |
| REC116-2116 | 39 - Disaster Risk Management | The working group recommends that a similar project to the Review of Australia's Ability to Respond to and Recover from Catastrophic Disasters be established to consider the longer term consequences of catastrophic disasters and their resulting recovery implications. Key aspects of such a review would include: |
| Rec-ID | Code | Recommendation |
|---|---|---|
| REC113-3904 | 39 - Disaster Risk Management | FESA should: in addition to its current initiatives, develop and implement structured programs (with clearly identified objectives, target groups and time lines for achievement) aimed at: |
| Rec-ID | Code | Recommendation |
|---|---|---|
| REC112-3934 | 37 - Funding | That DPI prepares guidelines, both internally and externally with Treasury, about funding arrangements for an outbreak. |
| Rec-ID | Code | Recommendation |
|---|---|---|
| REC111-3941 | 39 - Disaster Risk Management | That the State Disaster Management Group supported by the Department of Emergency Services ensures that State-wide a robust disaster risk management process is established that includes the aggregation of relevant information from local, district, functional and threat specific plans to develop a hazard risk profile for Queensland. |
| REC111-3940 | 39 - Disaster Risk Management | To enhance disaster risk management planning processes, it is recommended that the State Disaster Management Group supported by the Department of Emergency Services develop a suitable performance management system to ensure local, district, functional and threat specific Disaster Management Plans are — |
| Rec-ID | Code | Recommendation |
|---|---|---|
| REC104-2318 | 37 - Funding | When the research into prescribed burning and optimum fire protection described in Chapter 11, and the financial analysis of appropriate funding levels for prevention and suppression recommended in Chapter 15, are completed, DSE should develop a business case with Department of Treasury and Finance for assured funding to an agreed level over a three-year rolling cycle. |
| REC104-2325 | 39 - Disaster Risk Management | That CFA, DSE and MFESB continue to develop the partnership approach for fire safety with Local Government, industry and communities. |
| REC104-2195 | 38 - Agency/Department Reporting | That the creation of buffers by chaining and then burning swaths of mallee be explicitly monitored for: |
| REC104-2241 | 37 - Funding | That the financial models incorporate changes in public land use, particularly ‘Our Forests Our Future’, and the subsequent changes in fire management priorities. |
| REC104-2308 | 37 - Funding | That Government funding for Community Development Officers engaged in community support and rebuilding incorporates flexible resources to enable the purchase of services from a range of providers to ensure choice for those requiring support. |
| REC104-2317 | 39 - Disaster Risk Management | That DSE, with adequate resourcing, moves to a 12-month cycle of fire management to establish and maintain a more appropriate and balanced work program of prevention/mitigation and suppression. |
| REC104-2194 | 38 - Agency/Department Reporting | That the success of current buffers in terms of assisting suppression operations be continually reviewed, evaluated and documented. |
| REC104-2240 | 37 - Funding | That Government supports the immediate development of financial models to analyse and determine the appropriate level of investment in fire management planning, preparedness and suppression on public land. |
| REC104-2245 | 37 - Funding | That DSE includes the cost of tracks, as above, in the development of financial models to analyse and determine the appropriate level of investment in fire management planning, preparedness and suppression on public land. |
| REC104-2189 | 39 - Disaster Risk Management | That DSE and CFA as part of their long term planning, and in conjunction with the Commonwealth Bureau of Meteorology, consider ways in which evidence for climate change and El Niño–Southern Oscillation cycle impacts on the likelihood of unplanned fire, can be better incorporated into preparedness and response planning. |
| REC104-2193 | 38 - Agency/Department Reporting | That if ‘link’ burns continue to be used, then on-site weather sequences and fuel conditions marking successful (‘within explicit prescription’) and unsuccessful burns be documented. |
| REC104-2290 | 38 - Agency/Department Reporting | That instances where demand for air support outstrips the supply of State Fleet Aircraft available are recorded. |
| REC104-2244 | 37 - Funding | That DSE assesses the environmental and monetary cost of establishment and rehabilitation of temporary tracks, per 100 km, constructed during firefighting operations, and compare this with the recurrent costs of a program of maintaining existing tracks. |
| REC104-2289 | 38 - Agency/Department Reporting | That the joint agencies introduce a system of performance measures for reporting the effectiveness of aircraft in firefighting operations. |
| REC104-2243 | 37 - Funding | That Government reviews the funding for DSE for the 2004-2005 fire season to ensure that appropriate resources are available for fire prevention planning and preparedness. |
| REC104-2200 | 38 - Agency/Department Reporting | That DSE: |
| REC104-2242 | 37 - Funding | That the financial arrangements incorporate full cost recovery for prescribed burning to be undertaken over a number of weekends utilising Project Firefighters, CFA volunteers and MFESB members. |
| Rec-ID | Code | Recommendation |
|---|---|---|
| REC098-2171 | 37 - Funding | The Committee strongly recommends that the New South Wales, Victorian and Tasmanian Governments abolish the Fire Levy tax they impose on home and business insurance premiums (wherever applicable), making it payable through household rates instead. Any cost savings gained by the insurance industry through relief from collecting Fire Levies should be passed on to policyholders through reduced premiums. At the same time the Committee urges the Insurance Council of Australia to run ongoing education campaigns to increase public awareness on bushfire preparedness, including the need for insurance. |
| REC098-2177 | 39 - Disaster Risk Management | The Committee recommends that state and territory governments be required to regularly perform risk assessments to the land within their jurisdictions to ensure that bushfire prone areas are accurately identified |
| REC098-2186 | 38 - Agency/Department Reporting | The Committee recommends that the Department of Transport and Regional Services review its record keeping practices to show the type of emergency for which assistance is provided through the Natural Disaster |
| REC098-2169 | 37 - Funding | The Committee recommends that, for the purpose of communications for the police, ambulance and fire brigades, any rental costs associated with the use of radio sites under the care, control or management of the Commonwealth, state, territory or local government be waived, other than for the ongoing cost associated with the use of power at the site. |
| REC098-2158 | 37 - Funding | The Committee recommends that the Commonwealth should commit funding for aerial fire fighting beyond the 2003–04 season on the proviso that the Australasian Fire Authorities Council and the state and territory governments make a commitment to: |
| Rec-ID | Code | Recommendation |
|---|---|---|
| REC061-3253 | 37 - Funding | The Committee recommends that any change to the funding system reflect in a reduction of the total price charged to consumers through premiums by the insurance industry. |
| REC061-3418 | 37 - Funding | The Committee recommends that any change to the funding system reflect in a reduction of the total price charged to consumers through premiums by the insurance industry. |
| REC061-3252 | 37 - Funding | The Committee recommends that an equitable funding system be implemented which relates premiums to: |
| REC061-3246 | 38 - Agency/Department Reporting | The Committee recommends that performance monitoring standards be established, reviewed and maintained through a common reporting system by the Minister for Police and Emergency Services. |
| REC061-3417 | 37 - Funding | The Committee recommends that an equitable funding system be implemented which relates premiums to: |
| REC061-3251 | 37 - Funding | The Committee recommends that the Government act urgently to make the existing system of funding the fire services fair and equitable to all Victorians. |
| REC061-3416 | 37 - Funding | The Committee recommends that the Government act urgently to make the existing system of funding the fire services fair and equitable to all Victorians. |
| REC061-3249 | 37 - Funding | That the cost of a Bureau of Emergency Services Telecommunications centre be recovered through user charges. |
| REC061-3414 | 37 - Funding | That the cost of a Bureau of Emergency Services Telecommunications centre be recovered through user charges. |
| Rec-ID | Code | Recommendation |
|---|---|---|
| REC019-4145 | 37 - Funding | A fund be established to subsidise the purchase of equipment for bush fire brigades but that the granting of subsidies depend upon a certificate being received from the Bush Fires Board that the brigade in question is of a standard that will be available at all times for effective use and that adequate facilities are available for its storage and maintenance at a centre suitable for the brigade. |
| Rec-ID | Code | Recommendation |
|---|---|---|
| REC015_3959 | 37 - Funding | It is recommended that an annual grant be made to the Association for distribution among the brigades for the purposes of purchase of equipment of which the brigades are in urgent need. |